Site Survey and Export Package Inspection
Begin by checking the installation area, the delivery documents and every carton before any board is cut. Composite matrix decking and outdoor profiles should arrive on a level, dry surface, protected from standing water and direct heat. Inspect cartons for crushed corners, open wrapping or moisture marks, then compare the board lengths, clips, screws, joists, wall profiles and finishing trims with the packing list. Photograph any damage before moving the material, because this creates a clear record for the supplier and helps identify whether a problem occurred during export handling.
Allow the boards to acclimatise near the installation area for at least 48 hours, while keeping them supported on flat bearers. Do not leave packs directly on soil or an unfinished slab. The installation surface must be measured for falls, door thresholds, drainage points and fixed obstacles. Outdoor decking needs a fall of approximately 1 to 2 percent away from buildings, and wall cladding requires a drainage path behind the profiles so that rainwater cannot remain trapped.
Subframe Preparation for WPC Decking
A dependable subframe starts with a firm foundation. On concrete, repair loose areas and confirm that the slab can carry the combined weight of the frame, boards, furniture and users. For ground-level work, compact the base and use concrete pads, paving supports or adjustable pedestals at regular intervals. Timber or aluminium joists must remain straight, securely anchored and separated from persistent moisture. Set joists at the spacing stated by the board manufacturer, commonly 300 to 400 millimetres for residential decking, with closer centres required for diagonal layouts or heavy-use areas.

Check the frame with a long straightedge before fixing any boards. Joists that twist or vary in height will create rocking, visible waves and uneven clip pressure. Add perimeter joists around steps and exposed edges, and provide extra supports beneath board ends. Never rely on a single joist where two boards meet. Keep the top of the frame clear enough for ventilation, and include access points for drainage and future inspection. For wall cladding, install vertical or horizontal battens according to the profile direction, using corrosion-resistant fixings and packers to create a consistent ventilated cavity.
Cutting Boards and Installing Hidden Fixings
Use a sharp, fine-tooth circular saw or mitre saw with suitable eye and hearing protection. Measure each board twice, mark the cut on the reverse face where possible, and support the full length to prevent vibration. Composite matrix products should be cut at a steady feed rate. A blunt blade can generate excessive heat, fray the edges and leave a poor fit around posts or corners. Remove swarf from grooves before inserting clips, and seal or cover exposed cut ends with the specified end caps or edge profiles.
Start decking from the straightest visible edge using starter clips, then place the first board accurately before continuing across the frame. Engage side clips fully in the board grooves and fasten them into the centre of each joist without overtightening. The screw head should sit firm and flush, but it must not crush the clip or distort the board. For face-fixed border boards, pre-drill at the recommended diameter and maintain consistent screw alignment. Wall cladding boards should be fixed through the designed flange or clip channel, never through an unsupported decorative face unless the system specifically permits it.
Expansion Gaps and Junction Details
Composite profiles expand and contract with temperature, so gaps are part of the installation system rather than a defect. Leave the manufacturer’s specified end gap between board ends and fixed walls, commonly around 5 to 8 millimetres, with larger allowances for long runs and strong temperature variation. Stagger end joints between rows, support every joint on a joist, and avoid forcing boards together with a hammer. Around columns, drains, steps and door frames, leave enough clearance for movement while using a suitable trim to keep the detail neat.

At the outer perimeter, maintain a ventilation gap so air and water can pass beneath the deck. Do not block this space with mortar, soil or dense sealant. For cladding, leave movement gaps at corners, parapets and window openings, then cover them with compatible corner, starter and termination profiles. Follow the system drawings for vertical expansion breaks on long walls. Mixing profiles from different manufacturers can create mismatched tolerances, so confirm compatibility before installation.
Maintenance, Storage and Packaging Protection
After installation, sweep the surface regularly and wash it with clean water and a mild household detergent. Remove leaves from gaps and keep drains open. Deal with oil, food or rust marks promptly using the approved cleaner, testing it first on an inconspicuous area. Do not drag heavy furniture across the boards, use aggressive solvents or apply paint and sealant without written approval. Inspect clips, edge trims, stair nosings and visible screws at least twice a year, particularly after severe weather.
For future export shipments, package replacement boards and profiles on level, well-supported pallets with protective corner guards. Use strapping that holds the load without crushing the edges, and keep cartons dry with weather-resistant wrapping that still allows ventilation. Separate clips and screws in labelled inner packs, protect cut-to-length trims from abrasion, and record batch numbers on the packing list. Proper export packaging reduces damage in transit and ensures that the installer receives straight, identifiable components ready for accurate fitting.
